Through the specification of high quality prefabricated components, PCE is able to achieve the highest standards in superstructure construction for the hotel market. From design concept through to delivery, we are seeking to optimise the benefits of the products that we specify and design, and through utilising precast concrete elements in hotel design, we are able to take benefit of many of its inherent properties to assist in the functional and performance requirements of the building. Where precast concrete doesn't present the most appropriate design solution, other prefabricated systems such as insitu concrete, structural steelwork or timber are incorporated into the design. This hybrid approach ensures total flexibility and best value for our clients along with the optimum design solution.
Whole life performance issues such as acoustics and air-tightness are easily satisfied by PCE's design approach. Through careful specification and the use of efficient robust design details, concrete's density as a material combined with unparalleled levels of site workmanship can be utilised to offer a totally compliant system which does not require any subsequent preparatory treatments to achieve compliance. Also, by taking a holistic approach to the structures performance in operation and its services strategy, the thermal mass of concrete can be utilised as part of a smarter design which takes advantage of the buildings fabric to store and dissipate energy.
Further whole life benefits are available such as reduced maintenance due to the durability and robustness of concrete as a material. Also, through careful material specification and utilisation of appropriate manufacturing techniques and resources PCE is able offer structural elements with very high quality surface finishes. These components are suitable for receiving direct decoration without any preparatory treatment again removing both cost and interface issues.
PCE's total approach to providing superstructure solutions ensures that the accuracy and quality achieved through producing components in factory controlled environments is transferred to the construction activities. Working within extremely tight tolerances on site is second nature to us and results in our clients being able to both specify and construct subsequent finishes without the risk of expensive conflicts and clashes.